WELCOMEABOUT USSERVICESENGINEERING PROJECTSCOMMERCIAL PROJECTSRESIDENTIAL PROJECTSCONTACT USGREY FOX SEWER IMPROVEMENTS
GREY FOX SEWER IMPROVEMENTS

The proposed work for the Grey Fox Sewer Improvements
is to include:

Repair of approximately 250 linear feet of a small tributary channel and bedding of a sewer main that was eroded out during the 2013 flood event.  Work will include installation of temporary erosion control for construction, re-bedding the exposed sewer main, grading, placement of geo fabric and riprap along the drainage channel and placement of erosion control fabric as noted on bid schedule and on plans.

Click on the links below to access project information.

Grey Fox Sewer Improvements Invitation to Bid

Grey Fox Sewer Improvements Project Manual

Grey Fox Sewer Improvements Drawing Sheet 1 of 2

Grey Fox Sewer Improvements Drawing Sheet 2 of 2